Road Construction work(RCC,TREMIX,ASFALT)

The construction of roads can be described by three processes:Setting out,Earthworks,Paving construction. A commonly used setting out procedure is the profile board method. A series of boards that show the exact level 1 metre above the completed construction level are placed at intervals along the proposed line of the road. A profile board with a fixed height, called the traveller, is used for controlling the excavated levels between these profile boards. By placing the traveller in the sight-line between two level boards, it can be seen whether or not the excavation has been carried out to correct levels and adjusted accordingly. Earthwork is one of the major works involved in road construction. It involves the removal of topsoil, along with any vegetation, before scraping and grading the area to the finished ‘formation level’. This is usually done using a tractor shovel, grader or bulldozer. Below the formation level, the soil is known as the ‘subgrade’. It is essential that the strength of the subgrade is tested prior to earthwork beginning. Once the subgrade has been prepared and drainage or buried services installed, the paving construction can begin. Paving can be either flexible or rigid. There are pros and cons to each type, with one being selected over the other depending on the specific needs of a project. Rigid pavements tend to have lower maintenance costs, a longer design life and higher flexural strength; but flexible pavements tend to have lower construction costs and have a higher ability to expand and contract with temperature and so do not need expansion joints.

Our Location

Plot No.ISP -10, Opposite Sanghi Organization, Near Petrol Pump, MIDC Taloja Industrial Area, Navi Mumbai, 410208, Maharashtra, India

Our Email ID

safelineelectricals@gmail.com

We will get back to you within 24 hours, or call us everyday, 10:00 AM - 06:00 PM

+91-9372156520

+91-8104861607

Free Consultation

Get a free Quote